The fireplaces were rocked this week. The first one is upstairs and the second is downstairs. We did not expect the rock to go above the mantel, but as you can see it looks good.


The tile is all installed but some still needs grout. Below is the master tub and the shower next to it. Joyce is happy with her tile selection. If she is happy, I am extatic.


The rock is done on the front of the house and the garage doors are intalled.